Energy project case studies

BHESCo have completed more than sixty energy saving and renewable energy projects using our Pay As You Save finance model. Browse our case studies for a better understanding of how we can help you.

BHESCo have completed more than 60 energy saving and renewable energy projects using our Pay As You Save finance model.

At BHESCo, we work with the energy technologies that will deliver the best outcomes for our customers. 

Over the years, our projects have included solar power, ground source heat pumps, air source heat pumps, battery storage, energy efficiency improvements, smart energy controls, and more. 

Browse our collection of Case Studies for a flavour of our work and the innovative solutions we offer.

Featured Case Study

The Montessori Place School, Uckfield

Phase 1 (2016)

Technology installed:

27kW solar PV

106 LED lamps

300mm loft insulation

7kW air source heat pump

Lifetime Financial Saving: £49,260

Lifetime CO2 Saving: 1,191 tonnes

Phase 2 (2020)

Technology installed:

87kW ground source heat pump

13 boreholes (120m deep)

Underfloor heating

Lifetime Financial Saving: £49,260

Lifetime CO2 Saving: 1,191 tonnes

School / College

Plumpton College, Plumpton

Year: 2020

Technology Installed: 

           99.8kW roof-mounted solar PV array                

Lifetime Financial Savings: £96.680

Lifetime CO2 Saving: 160 tonnes

Housing Co-op

Bunker Housing, Brighton

Year: 2020

Technology Installed: 

6.7kW solar PV, 2 x hot water cylinder, 4 x heat recovery extractor fan

Lifetime Financial Saving: £13,479

Lifetime CO2 Saving: 38 tonnes

Church

Baptist Church, Horsham

Year: 2020

Technology Installed: 

          30kW roof-mounted solar PV array                                   

Lifetime Financial Saving: £30,592

Lifetime CO2 Saving: 160 tonnes

Sports & Leisure

The Unity Centre, Lewes

Year: 2019

Technology Installed: 

22kW air source heat pump, underfloor heating, heat zone control system, LED lighting

Lifetime Financial Saving: £24,525

Lifetime CO2 Saving: 336 tonnes

Golf Club

Dyke Golf Club, Brighton

Year: 2018

Technology Installed: 

7.7kW solar array, LED lighting, 10kW battery bank, monitoring & control system

Lifetime Financial Saving: £9,254

Annual CO2 Saving: 45 tonnes

Industry & Manufacture

Alistair Fleming Design, Lewes

Year: 2018

Technology Installed: 

29kW solar PV, 7 air-conditioning units , 79 LED lamps

Lifetime Financial Saving: £127,364

Lifetime CO2 Saving: 299 tonnes

High Street Retail

Alistair Fleming Design, Lewes

Year: 2018

Technology Installed: 

12kW SunAmp heat storage unit, wall-mounted fan convector heaters, LED lighting

Lifetime Financial Saving: £15,620

Lifetime CO2 Saving: 166 tonnes

Community Centres

Hollingdean Community Centre

Year: 2017

Technology Installed: 

4kW solar PV, 170mm roof insulation, 4 Radiator Reflector Panels, 56 LED Lamps

Lifetime Financial Saving: £30,793

Annual CO2 Saving: 4.47 tonnes

Office / Small Business

Werks Central, Brighton

Year: 2016

Technology Installed: 

12kW solar PV, Scarecrow acoustic bird dispersal system, 261 LED lamps

Lifetime Financial Saving: £30,793

Annual CO2 Saving: 165 tonnes

Other projects

Goldstone Primary

49.56kW solar

(2024)

Middle Street School

37.68kW solar

(2024)

Mile Oak Primary School

69.3kW solar

(2024)

Kingston Pavilion

16kW air source heat pump

(2021)

Werks Lewes

11kW solar, energy efficiency

(2021)

Brunswick Primary

76kW solar PV

(2020)

Patcham Junior

29.7kW solar

(2019)

Nafici Research

80kW biomass boiler 

(2016)

Want to start a project?

If you would like to discuss your ideas for a low-carbon energy project for your organisation, please leave your details using the form below and a member of our projects team will get back to you as soon as we can.